Supply of Air Compressors-IS: 5456 ( 18 pieces )

Department Of Military Affairs : New Delhi

Eligibility Criteria :

  • Minimum Average Annual Turnover of the Bidder : 8 Lakh (s)
  • Years of Past Experience required : 3 Year (s)
  • Past Performance : 50 %
  • Minimum 50% Local content required for MII compliance
  • Technical Specifications :
  • COMPRESSOR : Type of Air Compressor : Positive displacement – Reciprocating Piston Type, Duty Cycle – Continuous,  Type of Mounting – Tank Mounted, Number of Stages for compression – Two, Cooling System-  Air Cooled,  Lubrication Type – Oil Lubricated,  Inter Cooler- With,  After Cooler – Without,  Moisture separator – Without, Oil Separator – Without, Oil Cooler – Without, Refrigerated Dryer-  Without,  Heatless Dryer – Without, Air Filter – With, Rated Discharge Pressure (kg/cm2) : 18.0 to 18.9,  Gauranteed Free Air Delivery (FAD) at rated Pressure (Test procedure as per IS: 5456 – latest / ISO: 1217 – latest(CFM) :  18, 20, 25, 30, 33, 40, 44, 48, 50, 60, 64, 68, 70, 73, 80, 90, 100, 105, 110, 120, 125, 130, 140, 150, 160, 170, 180, 190, 200, 250, 300, 315, 340, 350, 360, 380, 400, 410, 415, 450, 470, 495, 500, 510, 540, 550, 570, 600, 635, 650, 675, 700, 750, 800, 850, 900, 1000, 1050, 1100, 1150, 1200, 1250, 1300, 1350, 1400, 1450, 1500, 1550, 1600, 1650, 1700, 1750, 1800, 1850, 1900, 1950, 2000, 27, 54, 75, 210, 35 Or higher,  Discharge Air Purity in respect of Solid Particles (as per ISO 8573-1 – latest : CLASS X, CLASS 7, CLASS 6, CLASS 5, CLASS 4, CLASS 3, CLASS 2, CLASS 1, CLASS 0 Or higher,  Discharge Air Purity in respect of humidity and liquid water (as per ISO 8573-1 – latest : CLASS X, CLASS 9, CLASS 8, CLASS 7, CLASS 6, CLASS 5, CLASS 4, CLASS 3, CLASS 2, CLASS 1, CLASS 0 Or higher,  Discharge Air Purity in respect of total Oil (as per ISO 8573-1 – latest : CLASS X, CLASS 4, CLASS 3, CLASS 2, CLASS 1, CLASS 0 Or higher,  Compressor – ISI Marked to IS: 5456 – latest : No
  • PRIME MOVER : Type of Prime Mover-  TEFC (Totally Enclosed Fan – Cooled) Electric Motor,  Power Supply : Three Phase, 415 ± 10% V AC, HZ,  Type of Drive ; Belt Drive
  • BATTERY : Availability of Test Report for Battery as per conforming specification – NA
  • AIR RECEIVER : Air Receiver Supplied with Compressor – Yes, Capacity of Air Receiver (Liters) – 250,  “Maximum Working Pressure (May indicate ‘0’ if Not Applicable)” – 12.0
  • INTER COOLER / AFTER COOLER : Type of Inter Cooler / After Cooler – Shell and Tube Type,  Design of Tube / Plate of Inter Cooler / After Cooler – Finned,  Material of Shell – Carbon Steel,  Material of Tube / Plate – Aluminium Alloy, Material of Fin-  Aluminium
  • Trailer-  Without
  • Instrumentation and safety devices : Discharge pressure gauge, Hour meter for recording running hours, Lubricating oil low pressure alarm, Lubricating oil pressure gauge, Power-‘On-off’ light indicator, Safety Valve on air/oil separator vessel, Safety Valve on Air Receiver, Unloaded Valve
  • OPERATING CONDITIONS : Minimum Operating Temperature : -10, -5, 0, 5 Or lower,  Maximum Operating Temperature:  55, 60, 65, 70 Or higher,  Operating Humidity, Rh at 40 deg C : 90, 95 Or higher,  Maximum Altitude without derating correction : 1000, 1500, 1800, 2000, 2500, 3000, 4000, 4200, 4500, 5000 Or higher
  • WARRANTY :  Warranty on Compressor Equipment : 1, 2, 3, 4, 5 Or higher,  “Warranty on Air End (May indicate ‘0’ if Not Applicable)” : 0, 1, 2, 3, 4, 5 Or higher,  Warranty on Prime Mover : 1, 2, 3, 4, 5 Or higher,  Warranty on Battery ; 1, 2, 3, 4, 5, 0 Or higher

Delivery Days : 30

Document Required :

  • Experience Criteria, Past Performance, Bidder Turnover, Certificate (Requested in ATC),Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer.
  • Bidder shall submit the following documents along with their bid for Vendor Code Creation:

a. Copy of PAN Card.

b. Copy of GSTIN.

c. Copy of Cancelled Cheque.

d. Copy of EFT Mandate duly certified by Bank.

  • Bidders are advised to check applicable GST on their own before quoting. Buyer will not take any responsibility in this regards. GST reimbursement will be as per actuals or as per applicable rates (whichever is lower), subject to the maximum of quoted GST %.
  • Bidder’s offer is liable to be rejected if they don’t upload any of the certificates / documents sought in the Bid document, ATC and Corrigendum if any.
  • In case the rejected items are not lifted by the firm within 48 hrs, the demurrage charges at the rate of 0.5% of total contract value will be charged per day. In case the items are not lifted within a month, the same will be destroyed by the station board of officers and no claim will be admitted. Demurrage charges. In case the rejected items are not lifted by the firm within 48 hrs, the demurrage charges at the rate of 0.5% of total contract value will be charged per day. In case the items are not lifted within a month, the same will be destroyed by the station board of officers and no claim will be admitted.
  • NON DISCLOSURE DECLARATION CERTIFICATE (On Bidder Letter Head) to be uploaded with bid:

1. I M/s. Firm Name hereby declare that I shall not disclose the contract or any provision, specification, plan, design, pattern, sample or information thereof to any third party during and after expiry of Contract. 2. If defying the norms as per the Contract a legal action may be taken against me as per the existing Rules

For Online Bidding Support : Call 9724912470 / 9898060200